Lessons in Change Management from “The Powers of Ten”

Lessons in Change Management from “The Powers of Ten”

In 1977, Ray and Charles Eames, celebrated for their iconic mid-century furniture, embarked on a cosmic journey. Their creation, “The Powers of Ten,” takes viewers from an ordinary picnic on Earth to the edges of the observable universe, showcasing the vastness and intricacy of our cosmos. Beyond its cinematic wonder, this film offers profound insights into change management – a journey of continuity and transformation. Let’s embark on a parallel voyage, learning valuable lessons from the Eames masterpiece. The link to the famous 9-minute video can be found here.

The Power of Change Management Components

Change management, much like the universe depicted in “The Powers of Ten,” encompasses a multitude of components. Let’s explore these components and understand how they relate to effective change management.

  1. Continuity and Change

In “The Powers of Ten,” we witness the dynamic interplay of continuity and change. Just as our universe maintains its constants while evolving, organizations must strike a balance between what remains unaltered and what must adapt. This balance is essential for effective change management. Identify the periods when your frontline staff are pivotal, align your change strategies with these busy phases, and ensure that new initiatives consider these high-activity periods.

  1. Understanding Cultural Context

In “The Powers of Ten,” every frame reveals shifting perspectives. Similarly, when communicating change, acknowledge the diverse lenses through which employees view your messages. Understand their cultural contexts and adapt your approach. One-size-fits-all communication often falls short. Tailor your messages to resonate with various audiences, fostering greater acceptance and engagement.

  1. Cross Collaboration through Context

Change flourishes when change drivers collaborate effectively with change receivers. Drivers must provide vision, intent, resources, and leadership, while receivers offer feedback, support, and behavioral adjustments. Successful collaboration relies on a deep understanding of each other’s contexts. Learn why changes are necessary, how to implement them, and what they require. Acknowledge the cultural context of those impacted by the changes, a crucial aspect often overlooked.

  1. Data-Driven Decision-Making

Statistics reinforce the importance of change management. According to a study by Prosci, organizations using a structured approach to change management are 78% more likely to meet or exceed their project objectives. This statistic underscores the need for a strategic, data-driven approach in change management. Make informed decisions, assess the impact of change initiatives, and use data to guide your strategy.

  1. Stakeholder Engagement and Communication

Effective change management relies on robust stakeholder engagement and clear communication. Just as “The Powers of Ten” engages viewers with its visuals and narration, your change initiatives should engage stakeholders through well-crafted communication strategies. Ensure all stakeholders are informed, involved, and heard throughout the change process.

  1. Leadership and Vision

In the Eames film, the journey from picnicking on Earth to exploring the cosmos required a guiding vision. Similarly, successful change management necessitates strong leadership and a clear vision for the future. Leaders must inspire, provide direction, and motivate teams to embrace change.

Leadership-and-Vision-Guiding-Change-Effectively

“The Powers of Ten” is more than a cinematic masterpiece; it’s a guide to navigating change within your organization. Embrace continuity while ushering in change, acknowledging the diverse cultural contexts of your employees. Facilitate collaboration through shared understanding, and maintain a sense of curiosity as you traverse the ever-evolving landscape of change management.

Take your first step into change management’s cosmic universe. Book a weekly demo with us to learn how to navigate the challenges and opportunities effectively.

How to Land Multiple Change Initiatives: Key Lessons for Change Practitioners

How to Land Multiple Change Initiatives: Key Lessons for Change Practitioners

Most organisations running more than three simultaneous change initiatives are not managing change, they are managing collisions. A new enterprise resource planning system lands at the same time as a workforce restructure and a cultural transformation programme. Each stream has its own change manager, its own communications plan, and its own timeline, and none of them knows what the others are asking of the same group of frontline employees. The result is not failed change, exactly. It is change that technically “lands” by project metrics while producing confusion, fatigue, and quiet resistance in the people it was meant to shift.

This problem is more common than most organisations admit. Prosci’s research on change saturation consistently identifies the volume and pace of simultaneous change as one of the top obstacles to successful adoption, yet the dominant response remains treating each initiative as its own contained project. Change practitioners are asked to be excellent within their lane while the organisation fails to manage the road. Individual programme excellence is necessary, but not sufficient. What is missing is a portfolio-level discipline for landing multiple changes simultaneously.

This article draws on frameworks developed for the ACMP (Association of Change Management Professionals) conference and unpacks what it actually takes to land multiple change initiatives well. The answer is not simply more resources or better project management. It requires a systems thinking approach, a clear-eyed view of cumulative employee load, deliberate sequencing decisions, and governance structures that can make cross-programme calls in real time.

Landing multiple change initiatives - ACMP conference presentation slides

Download the ACMP conference slides on landing multiple changes for the full presentation framework.

Why landing multiple changes requires a different approach

The traditional change management model is built around a single initiative. You assess the impact, identify the stakeholders, design the engagement plan, and manage resistance along the journey from current state to future state. That model is coherent and well-supported by decades of research and practice. It is also structurally blind to what happens when five versions of it are running simultaneously across the same organisation.

The problem is not that individual change managers are doing their work poorly. It is that the unit of analysis is wrong. When multiple programmes compete for the same leadership attention, the same communication channels, and the same employee bandwidth, the interactions between those programmes become more consequential than the design of any single one. A well-crafted communications plan for Programme A becomes noise when Programme B sends three emails to the same audience on the same day. A training schedule for Programme C creates conflict when Programme D pulls team leaders into workshops during the same fortnight.

McKinsey research on organisational change has repeatedly found that one of the most significant barriers to successful transformation is the failure to coordinate across parallel workstreams. Organisations that treat each initiative as an isolated effort consistently underestimate the cumulative demands placed on the same pools of people. The fix is not project management discipline within each stream. It is a deliberate shift in perspective to the portfolio level, where the interactions between initiatives can be seen and managed.

A systems thinking lens for change portfolio management

Systems thinking offers a more honest way to look at a change portfolio. Rather than treating each initiative as a bounded input-output process, systems thinking asks: what are the interdependencies, feedback loops, and unintended consequences that emerge from the whole? Applied to change management, it means asking not just “will this programme land?” but “what does the system look like when all programmes are running simultaneously, and where are the points of overload or conflict?”

The practical starting point is mapping the portfolio as a system rather than a list. This means identifying which employee groups are touched by each initiative, at what intensity, and over what time period. It means tracing which senior leaders are sponsors of multiple programmes and therefore have divided attention. It means understanding which communication channels are shared across initiatives, and how often those channels are already saturated. This kind of mapping is not an abstract exercise. It surfaces the concrete conflicts that will derail adoption before they happen, rather than after.

A systems lens also changes how you think about success. In a single-programme model, success means the programme achieves its stated outcomes. In a portfolio model, success means the organisation moves forward across all initiatives without destroying the human capacity it needs to sustain them. Gartner’s research on organisational change fatigue found that employees who experience high volumes of change are significantly more likely to report intention to leave, reduced discretionary effort, and lower wellbeing, all of which undermine the very outcomes the change programmes are trying to achieve. Managing the system means managing those risks, not just the project plans.

Understanding cumulative change load on employee groups

The concept of cumulative change load is central to landing multiple initiatives well. Change load refers to the total volume, complexity, and pace of change being asked of a particular employee group at a given point in time. It is not the same as the number of initiatives running in the organisation. It is specific to the experience of a defined group of people, and it varies enormously depending on which programmes touch that group and how intensively.

Frontline team leaders are almost always the most overloaded group in a change portfolio, and they are also the most critical to adoption success. They are typically the key conduit through which every initiative reaches employees on the ground. They attend programme briefings, model new behaviours, coach their teams through transitions, and handle the questions and resistance that employees bring to them. When three programmes ask this of them simultaneously, the cumulative load does not add up linearly. It compounds. Attention splits. Credibility with their teams is at risk if they cannot answer questions about changes they have only partially understood themselves.

Mapping change load by employee group requires moving beyond the programme-level view to an employee-centric view. For each group, you need to understand the total number of active changes affecting them, the degree to which those changes require active behavioural shift versus passive awareness, the timing of key milestones across all programmes, and the existing workload context. This is not a one-time assessment. Change load is dynamic. It shifts as programmes progress, as timelines slip, and as new initiatives are added to the portfolio. Practitioners who treat it as a snapshot rather than a live measure will always be working with outdated information.

Sequencing and timing: the critical decisions

Once you have a clear view of cumulative change load across employee groups, sequencing becomes a strategic tool rather than a scheduling exercise. The question is not just “when can we start?” but “when is this group ready to absorb this change, given everything else they are navigating?” These are different questions, and they lead to different decisions.

Sequencing decisions at the portfolio level typically involve trade-offs that no single programme team is positioned to make. Delaying the go-live of one initiative by six weeks might significantly reduce the load on a critical employee group during a peak period for another programme. But that decision has cost and timeline implications that affect the business case for the delayed programme. Making that call requires a view across the portfolio and authority to act on it. In most organisations, that view and that authority sit in different places, which is why sequencing decisions rarely get made proactively. They get made retrospectively, when something breaks.

Timing also matters at the level of change saturation within the annual cycle. Most organisations have predictable patterns of peak operational demand, whether driven by financial year cycles, product launches, regulatory reporting periods, or seasonal factors. Layering major change activity on top of those peaks is a common and avoidable mistake. A portfolio-level view that maps change milestones against operational calendars gives leaders the information they need to avoid the most predictable collisions. Harvard Business Review has noted that organisations which deliberately pace change, rather than accelerating every initiative simultaneously, achieve significantly better adoption outcomes even if individual programmes take longer to complete.

Building cross-programme stakeholder coordination

Stakeholder management in a portfolio context is categorically different from stakeholder management within a single programme. The same senior leaders appear as sponsors, champions, or key influencers across multiple initiatives. The same middle managers are being asked to role-model change, communicate updates, and embed new processes across several programmes at once. And the same employees are receiving messages from multiple directions about what they need to do differently and why.

Effective cross-programme stakeholder coordination requires a deliberate effort to understand the total demands being placed on shared stakeholders. This means change teams across programmes regularly sharing their stakeholder engagement plans, identifying where they are drawing on the same people, and making collective decisions about how to sequence and rationalise those demands. It sounds straightforward, but in practice it requires a level of transparency and collaboration between programme teams that organisational siloes make difficult.

One practical mechanism is a shared stakeholder engagement calendar that all programme change managers can view and contribute to. This does not eliminate competition for attention, but it makes the competition visible. When a senior leader’s assistant can see that five programmes have each independently scheduled a 90-minute engagement session with their principal in the same month, they can flag the problem. Without that visibility, each session gets booked as if it were the only one. The calendar is a simple tool, but its value is in the shared picture it creates, not the scheduling function it performs.

Cross-programme communication coordination is equally important. Employees receiving multiple streams of change communication need a coherent narrative, not a collection of disconnected announcements. Where possible, programme teams should agree on a shared change story that contextualises each initiative within the broader direction the organisation is moving. This does not mean homogenising all messaging. It means ensuring that when employees ask “why are we doing all of this at once?”, there is a credible answer that connects the dots rather than leaving them to construct their own, often pessimistic, interpretation.

Governance structures that enable portfolio decisions

All of the practices described above, whether mapping change load, making sequencing decisions, or coordinating stakeholder engagement, require a governance structure that can see across the portfolio and act on what it sees. Most organisations do not have this. They have programme steering committees, each of which has a mandate to deliver its own initiative as efficiently as possible. Those committees have no structural incentive to delay or modify their programme for the benefit of another. And so, even when individual programme leaders recognise that the portfolio is overloaded, the governance architecture makes it nearly impossible to do anything about it.

A portfolio change governance function, whether a formal Change Advisory Board or a lighter-touch change portfolio forum, provides the cross-programme view and the decision-making authority to manage the portfolio as a whole. Its mandate is explicitly different from any individual programme’s steering committee. It is not accountable for the delivery of a single initiative. It is accountable for the organisation’s capacity to absorb change across all initiatives, and for protecting the human and leadership resources that every programme depends on.

The critical design question is not what to call this forum, but what authority it has and who sits in it. A portfolio change governance body without authority to delay, re-sequence, or scale back individual programmes is merely a reporting mechanism. It can describe the problem but cannot fix it. Effective portfolio governance requires executives who have accountability across the change portfolio, not just within their own business unit’s initiatives. Prosci’s best practices research consistently finds that active and visible executive sponsorship is the single greatest contributor to change success, and in a portfolio context, that sponsorship must extend to the portfolio level, not just the programme level.

How The Change Compass supports practitioners managing multiple initiatives

Practitioners who are trying to build a portfolio-level view of change often find that the data they need is scattered across multiple project plans, spreadsheets, and stakeholder maps, each maintained by a different programme team and formatted differently. Aggregating that information manually is time-consuming and almost always out of date by the time it is compiled. The Change Compass is a digital platform built specifically to solve this problem. It enables change practitioners to map the change portfolio across employee groups in real time, visualise cumulative change load, and identify the timing conflicts and saturation risks that individual programme views cannot reveal. Rather than replacing the judgement of experienced practitioners, it gives them the information infrastructure to exercise that judgement at the right level. For organisations managing complex, multi-initiative portfolios, having a shared, live view of the change landscape is not a nice-to-have. It is the operational foundation that makes portfolio-level decisions possible.

Frequently asked questions

What is change portfolio management and how is it different from programme management?

Change portfolio management is the discipline of overseeing and coordinating all active change initiatives across an organisation simultaneously, rather than managing each programme in isolation. Where programme management focuses on delivering a defined scope on time and on budget, change portfolio management focuses on the organisation’s total capacity to absorb change and the interactions between initiatives. It asks questions that no single programme team can answer: which employee groups are most overloaded, which sequencing decisions will reduce collision risk, and which governance structures can make cross-programme calls.

How do you measure cumulative change load on employee groups?

Measuring cumulative change load starts with identifying every active change initiative that affects a defined employee group, then assessing the intensity and timing of that impact. Intensity can be measured across dimensions such as the degree of behavioural change required, the volume of training, the frequency of communication, and the level of disruption to existing workflows. These assessments are then aggregated across all initiatives to produce a load profile for the group over time. The key challenge is maintaining this view dynamically, since change load shifts as programmes progress, timelines change, and new initiatives are added.

What governance structure works best for managing a change portfolio?

The most effective governance structure is one that has a cross-portfolio mandate and real decision-making authority, rather than a purely advisory or reporting function. This typically takes the form of a Change Advisory Board or Change Portfolio Forum that meets regularly, includes executives who own accountability across multiple programmes, and has the authority to re-sequence, delay, or modify initiatives based on portfolio-level capacity considerations. The critical factor is that membership and authority must cross business unit boundaries, since portfolio conflicts almost always involve competing priorities from different parts of the organisation.

How should change practitioners prioritise when multiple initiatives compete for the same resources?

Prioritisation in a change portfolio context should be based on a combination of strategic importance, time sensitivity, employee group impact, and dependency sequencing. Where two initiatives compete for the same leadership attention or employee bandwidth, the portfolio governance body should assess which programme’s momentum is more critical to protect at that point in time, and which can absorb delay or reduced intensity without jeopardising its outcomes. Practitioners can support this decision by providing clear data on the impact of delay for each initiative, as well as the cost to employee wellbeing and adoption quality of proceeding with both simultaneously.

References

Prosci. Change Saturation: How to Manage Too Much Change. Prosci Research.

McKinsey & Company. Change management that works. McKinsey & Company.

Gartner. Organisational Change Management Insights. Gartner Human Resources Research.

Harvard Business Review. The Case for Slowing Down When Your Organization Is Overwhelmed. Harvard Business Review, January 2020.

Prosci. Best Practices in Change Management. Prosci Research.

Landing Multiple Changes: Insights from the ACMP Conference

Landing Multiple Changes: Insights from the ACMP Conference

At the ACMP (Association of Change Management Professionals) Global Conference in Las Vegas, a recurring theme surfaced across sessions and hallway conversations alike: most organisations are no longer managing one or two significant changes at a time. They are managing dozens, sometimes scores, of concurrent initiatives, each with its own timeline, sponsor, and change team, and very few have a coherent way to think about that complexity at a portfolio level. The conference brought together some of the sharpest practitioners in the field, and what became clear was that the profession’s frameworks, mostly designed for individual change programmes, are straining under the weight of modern organisational reality.

A presentation at the conference tackled this directly using an analogy that landed with unusual force in the room: the airport. Picture a busy international airport on a peak travel day. Dozens of aircraft are inbound at any given moment, each on its own flight path, each carrying its own crew and passengers, each with its own landing requirements. The air traffic control tower does not manage one plane at a time in isolation. It holds a real-time picture of the entire airspace, sequences arrivals to avoid collision, manages runway capacity, and reroutes aircraft when conditions change. That picture, the presentation argued, is precisely what most change functions are missing. They are flying individual planes without a control tower.

The analogy is deceptively simple, and that is exactly what makes it powerful. It gives executives and change leaders a shared mental model for a problem that is genuinely difficult to describe in the abstract. This article unpacks the key insights from that ACMP Conference presentation, explores why the aviation framework resonates so strongly with practitioners, and sets out the practical implications for organisations that are serious about building portfolio-level change capability.

Landing multiple changes - ACMP conference presentation on change portfolio management

Download the ACMP presentation slides for the full conference framework on landing multiple changes.

The aviation analogy and why it works for change management

Change management has no shortage of analogies. Burning platforms, navigating white water, unfreezing and refreezing: the field has long relied on metaphor to make abstract concepts tangible. But most of those metaphors describe the experience of a single change initiative. The aviation analogy is different because it captures the system-level problem: what happens when many changes are competing for the same runway at the same time.

In the airport model, each aircraft represents a change initiative. The runway represents the finite change absorption capacity of the organisation, specifically the bandwidth that employees, managers, and business units have to take on new ways of working. The air traffic control tower represents the change portfolio function: the team or mechanism that holds a view across all inbound changes, sequences them intelligently, and makes active decisions about which initiatives land when, which go into a holding pattern, and which need to be redirected entirely.

What makes this analogy particularly useful in conversations with senior executives is that it makes the capacity constraint visceral. Every experienced traveller knows what happens when too many aircraft try to land at once: delays, near-misses, diversions to other airports, and occasionally, catastrophic failure. When a chief executive or a chief operating officer hears that framing applied to their change portfolio, the message lands with a clarity that a spreadsheet of initiative timelines rarely achieves. The analogy also introduces the concept of sequencing as a professional discipline, not a scheduling afterthought. Air traffic controllers are highly trained, deeply respected professionals. The suggestion that change portfolio management deserves the same rigour is exactly the reframing many change functions need when making the case for investment.

Key insights on change portfolio complexity from ACMP

One of the central observations from the conference presentation was that the complexity of a change portfolio is not simply additive. Ten simultaneous initiatives are not just ten times harder to manage than one. They are exponentially harder, because each new initiative interacts with every other one. A technology rollout in one division affects the change capacity of managers who are simultaneously being asked to support a restructure, a new performance framework, and a shift to agile ways of working. The interactions between initiatives create compounding demands on the same people, and those demands are invisible unless someone is actively mapping them.

Research supports this observation. A Prosci benchmarking study found that one of the most frequently cited barriers to successful change is inadequate organisational capacity, with change saturation among employees and managers identified as a primary cause of initiative failure. When multiple changes land simultaneously on the same employee population without coordination, the result is not just fatigue, it is active disengagement. Employees who are asked to absorb too much too quickly tend to comply superficially with the most visible demands while quietly abandoning the rest.

The conference presentation also highlighted the role of interdependencies between initiatives as a source of underestimated risk. When Initiative A depends on the completion of Initiative B, and Initiative B is running three months late, the downstream effects ripple through the portfolio in ways that no individual project team can see or manage. Portfolio-level visibility is the only defence against this kind of systemic risk. Without it, organisations are essentially flying blind in a crowded airspace.

From individual change programmes to coordinated portfolio management

The shift from managing individual change programmes to managing a portfolio of concurrent changes is not merely a scaling exercise. It requires a different mindset, different tools, and a different organisational structure. At the individual programme level, the change manager’s primary orientation is toward a specific group of stakeholders affected by a specific initiative. At the portfolio level, the orientation must shift to the organisation as a whole, with the change function acting as a steward of overall change capacity rather than an advocate for any single initiative.

This shift mirrors a well-documented evolution in project management. The discipline of project portfolio management emerged precisely because organisations recognised that managing projects in silos produced suboptimal results at the organisational level, even when individual projects were executed well. According to Gartner research on portfolio management, organisations with mature portfolio management capabilities consistently deliver better strategic alignment and resource utilisation than those managing initiatives independently. Change management is now at the same inflection point that project management reached a decade ago.

The practical implication is that the change function needs to develop two distinct competencies in parallel: the ability to deliver high-quality support to individual initiatives, and the ability to manage the portfolio as a system. Neither competency substitutes for the other. An organisation that is excellent at individual change management but lacks portfolio coordination will still suffer from change saturation and sequencing failures. An organisation that has a sophisticated portfolio view but weak initiative-level change capability will plan well and execute poorly. Both are required.

The role of change data in multi-initiative environments

One of the most striking themes to emerge from the ACMP Conference was the degree to which effective portfolio change management depends on data. Not opinion, not intuition, and not the loudest programme sponsor’s view of how their initiative is tracking. Actual data: about the volume of change hitting specific employee populations, about the pace at which those populations are absorbing change, about which parts of the organisation are approaching saturation and which have capacity to absorb more.

The aviation analogy maps directly onto this data requirement. Air traffic controllers operate with real-time data feeds covering aircraft position, speed, altitude, weather conditions, and runway status. They do not guess. They do not rely on reports that are three weeks old. They have a live picture of the airspace and they act on it continuously. For change portfolio management to function with comparable rigour, change functions need access to current, structured data about the state of every initiative in the portfolio and its impact on the people it is touching.

A Harvard Business Review analysis of change analytics found that organisations using data-driven approaches to managing change were significantly more likely to achieve their intended outcomes, particularly in environments where multiple initiatives were running simultaneously. The discipline of building change impact data, tracking adoption metrics across initiatives, and using that data to make sequencing decisions is still nascent in most organisations, but it is the direction the profession is clearly moving. The ACMP Conference made this trajectory unmistakably clear.

Building organisational capability for portfolio change management

Developing portfolio change management capability is a long-term investment, not a quick structural fix. Organisations that do it well tend to build it through a deliberate sequence of steps, rather than attempting to implement a fully mature model overnight. The ACMP presentation outlined several building blocks that are consistently present in organisations with mature portfolio change capability.

The first is governance. Effective portfolio change management requires a forum where decisions about sequencing, resourcing, and initiative prioritisation are made with visibility across the full portfolio. This is typically a change governance committee or equivalent body, with representation from HR, programme management, and senior business leaders. Without this forum, even the best data and frameworks will sit unused, because there is no mechanism to act on them.

The second building block is a shared language. The aviation analogy itself is a tool for building this shared language. When executives, programme managers, and change practitioners all use the same framework to describe portfolio dynamics, conversations about sequencing and capacity become markedly more productive. Shared language reduces the friction of cross-functional portfolio decisions and makes it easier to surface conflicts early, when they are still manageable.

The third building block is standardised change impact assessment. For a portfolio view to be meaningful, there needs to be a consistent way of measuring and describing the change load that each initiative places on each part of the organisation. Without that consistency, aggregating data across initiatives is like trying to add apples and oranges. McKinsey’s research on organisational change effectiveness consistently points to the importance of structured, comparable assessment methods as a foundation for portfolio-level decision making.

Practical frameworks for coordinating concurrent initiatives

The ACMP presentation offered a set of practical framings for change portfolio coordination that practitioners can apply directly in their own organisations. At its core, the portfolio coordination challenge has three distinct dimensions: volume, velocity, and interdependency. Volume refers to the total number of initiatives and the aggregate change load they represent. Velocity refers to the pace at which changes are being introduced, and specifically whether that pace exceeds the organisation’s absorption rate. Interdependency refers to the relationships between initiatives, including shared stakeholder populations, sequential dependencies, and resource conflicts.

Effective portfolio coordination requires active management of all three dimensions simultaneously. On volume, the key discipline is maintaining a complete and current inventory of all active change initiatives, mapped to the employee populations they affect. This sounds straightforward, but in large organisations with multiple business units and dozens of concurrent programmes, maintaining that inventory is a significant undertaking in its own right. Many organisations discover, when they first attempt this exercise, that they have considerably more active initiatives than anyone realised.

On velocity, the key discipline is establishing explicit thresholds for change absorption capacity and using those thresholds to drive sequencing decisions. This is the runway management function from the aviation analogy. Just as a runway has a fixed throughput capacity, the organisation’s change absorption capacity is finite. When planned initiative timelines would breach that capacity, something has to give: either the timeline adjusts, the scope of an initiative reduces, or a deliberate decision is made to accept higher risk in a specific part of the organisation.

On interdependency, the key discipline is mapping the relationships between initiatives before they create conflicts, not after. This requires a portfolio view that extends at least twelve months forward, with enough granularity to identify where two or more initiatives will be making simultaneous demands on the same teams or the same managers. Catching those conflicts in the planning stage, when adjustments are relatively cheap, is far preferable to discovering them during delivery, when the cost of adjustment is typically much higher.

How The Change Compass supports change portfolio coordination

Translating these frameworks from presentation slides into day-to-day practice requires tools that can hold the portfolio view and make it accessible to the people who need to act on it. The Change Compass is a digital platform designed specifically for this purpose. It enables change functions to build a consolidated view of all active and planned initiatives, mapped against the employee populations they affect, so that portfolio-level patterns, capacity constraints, and sequencing conflicts become visible before they become problems. The platform supports the kind of data-driven portfolio coordination that the ACMP Conference highlighted as the next frontier for the change management profession, giving change leaders the equivalent of an air traffic control system for their organisation’s change airspace.

Frequently asked questions

What is change portfolio management?
Change portfolio management is the discipline of overseeing all active and planned change initiatives across an organisation as an integrated portfolio, rather than managing each programme in isolation. It involves assessing the aggregate change load on different parts of the organisation, sequencing initiatives to avoid overloading specific teams or employee groups, and making active governance decisions about the timing and prioritisation of concurrent changes.

Why do organisations struggle with managing multiple concurrent change initiatives?
Most change management frameworks and tools were developed for single-initiative contexts. When multiple changes run simultaneously, they compete for the same finite change absorption capacity within the organisation, and their interactions create compounding complexity that no individual programme team can see or manage. Without a portfolio-level view, organisations tend to discover sequencing conflicts and capacity breaches only after they have already caused problems.

How does the aviation analogy help explain change portfolio management to executives?
The airport and air traffic control analogy gives executives a concrete and intuitive picture of a problem that is otherwise difficult to communicate in the abstract. It makes the capacity constraint visible (the runway), establishes the role of active coordination (the control tower), and frames sequencing as a professional discipline rather than an administrative function. Executives who travel frequently find the analogy immediately resonant and often use it themselves once they have encountered it.

What data does a change portfolio management function need to operate effectively?
At minimum, an effective change portfolio function needs a current inventory of all active and planned initiatives, a consistent assessment of the change load each initiative places on each affected employee group, and forward visibility of at least twelve months to identify where initiative timelines will create capacity conflicts. Over time, organisations also benefit from tracking actual adoption rates across the portfolio, to compare planned versus real absorption and adjust future sequencing decisions accordingly.

References

Prosci. Change management benchmarking research. Prosci Inc.

Gartner. Build a portfolio management office. Gartner Inc.

Harvard Business Review. The analytics organisations need to manage change. HBR, March 2019.

McKinsey & Company. Change management that works. McKinsey & Company.

Bridging the Gap Between Agile and Change Management: Key Principles for Success

Bridging the Gap Between Agile and Change Management: Key Principles for Success

In the ever-evolving landscape of project management and software development, Agile has transcended its origins and become a versatile approach applied not only in software development but also in project and operations management. As Agile gains popularity, change practitioners are increasingly aligning their strategies to support Agile environments. This article explores the fundamental principles of Agile and how they dovetail with change management, highlighting the valuable lessons we can draw from Agile’s evolution.

The Convergence of Agile and Change Management

Agile’s Expansion Beyond Software Development

Agile, initially conceived for software development, has expanded its horizons to encompass project management and operations. The principles that underpin Agile, outlined in the Agile Manifesto, have become a guiding light for many across various industries. With methodologies like Scrum, Kanban, and Refactoring, Agile can be applied at different levels, from project teams to program and portfolio management.

Change Management and Agile: A Harmonious Union

Having personally gone through the Scaled Agile certification process, I was struck by how many fundamental change management principles are deeply embedded within Agile. In my multi-day training course, case studies, and examination, I realized that many concepts that are considered common sense in change management are sometimes perceived as ‘new’ for technical leads or project managers in an Agile context. Agile inherently incorporates principles that change managers have advocated for a long time.

Change-Management-vs-Agile

Foundational Change Management Principles in Agile

1. Individual Interactions Over Processes and Tools

In technology-driven environments, technical professionals are highly regarded for their problem-solving skills. The typical response to issues or improvement opportunities is to seek technical solutions. However, the Agile Manifesto focuses on people and interactions. It stresses that teams perform at their best when they maintain constant interaction to ensure effective communication, clarity, and understanding of the work at hand. For instance, a study by McKinsey found that projects with strong team interactions deliver on their objectives 95% of the time, while those lacking strong collaboration only succeed 50% of the time. This principle resonates strongly with change managers, who have consistently advocated for a focus on people and behaviors as central to change management success.

2. Early Involvement of Stakeholders

Agile projects move swiftly, making it crucial to involve stakeholders early in the project development lifecycle. Early engagement ensures clear alignment, fosters relationships among team members, and helps draw out assumptions and set expectations. For example, a survey conducted by Prosci revealed that projects involving early stakeholder engagement had a 74% success rate, compared to only 31% for projects that did not engage stakeholders early. This aligns with change management practices, which emphasize engaging stakeholders early to secure buy-in and alignment. Beyond formal communication, it encourages open dialogue and the testing of assumptions for early clarity across the project team.

3. Empowering Team Members

Traditionally, project managers held the reins in decision-making across all aspects of a project, including solution features and task allocation. Agile challenges this command-and-control model by empowering teams to make these decisions. Effective Agile teams are often self-organized, with project managers transitioning to coaching and enabling roles. For example, a study by Gallup found that empowered teams have 21% higher productivity and 28% less absenteeism. This empowerment aligns with the core principles of change management, which emphasize team dynamics and employee empowerment as essential for team development and engagement.

4. Cross Collaboration

Agile projects thrive on the diverse collaboration of team members from different disciplines and departments. This diversity of thought leads to more innovative ideas, as it brings different perspectives to problem-solving. For example, a report by Deloitte found that organizations with cross-functional teams are 1.7 times more likely to be leaders in innovation. Agile practices, such as cross-team daily stand-ups, release planning, and retrospectives, require different disciplines to come together and contribute to the project. Change management has long focused on breaking down silos and promoting collaborative behaviors, using workshops, communication, campaigns, and leadership influence to foster the right culture and behaviors for successful outcomes.

5. Designing Bite-Sized Changes

One of Agile’s fundamental principles is the idea that, instead of launching large, all-encompassing changes, it’s better to break them down into smaller, iterative pieces. This approach allows for continuous learning and improvement and mitigates the risk of major failures. Change management aligns with this principle by assessing the change capability and capacity of impacted audience groups. For instance, a case study by Prosci showed that an organization that implemented small, incremental changes had a 20% higher user adoption rate compared to organizations that introduced major changes all at once. Smaller, bite-sized changes are easier for users to accept, preventing change fatigue and disruptions to business as usual.

6. Leadership

Agile explicitly acknowledges that organizational managers and leaders bear the ultimate responsibility for the adoption, success, and continuous improvement of lean practices. Leaders must steer the organization towards agile and lean behaviors, role-model the right behaviors, create an environment conducive to team success, and ensure continuous team learning. Leadership plays a central role in change management, driving transformation, and cannot be delegated.

Agile and Change Management in Action: Best Practices

As we’ve explored the evolving landscape of project management and software development, it’s clear that Agile is no longer confined to its origins. It has become a versatile approach, expanding beyond software development to encompass project and operations management. With Agile’s growing popularity, change practitioners are increasingly aligning their strategies to support Agile environments. In this article, we’ve delved into the fundamental principles of Agile and how they seamlessly integrate with change management. Now, let’s take a closer look at real-world best practices with actionable advice and examples that illustrate the power of combining Agile and change management in practical scenarios.

What’s more, we provide actionable advice that you can apply directly to your projects. Whether you’re leading a software development team or managing a complex change initiative, the best practices we showcase can be tailored to suit your specific needs. From effective stakeholder engagement techniques to strategies for empowering your teams, you’ll find practical steps to ensure your projects thrive. For example, implementing daily stand-up meetings for cross-functional teams can significantly enhance collaboration and idea exchange within your projects.

By incorporating these best practices, organizations can harness the full potential of Agile and change management to adapt, innovate, and achieve exceptional results. With expert guidance and empirical evidence of successful benchmarks, you can confidently implement these principles in your projects, ensuring success in even the most complex and dynamic environments.

The synergy between Agile and change management is undeniable. Agile principles, which emphasize people, collaboration, empowerment, and adaptability, align remarkably well with the foundational principles of change management. Whether transitioning from a technical background to Agile or integrating Agile into change management practices, it’s essential to recognize that Agile is more about mindset and principles than specific technicalities. By embracing these shared principles, change management and Agile become a harmonious partnership, working together to drive successful transformations and project outcomes.

To learn more about how The Change Compass can help you bridge the gap between Agile and change management, book a weekly demo with us.

The Ultimate Guide to Change Portfolio Management

The Ultimate Guide to Change Portfolio Management

The change management profession has grown by leaps and bounds. This is proportional to the speed and magnitude of change that organisations are currently going through. To manage this complexity, a lot of large organisations have created ‘enterprise change management’ or ‘portfolio change management roles’ to tackle this.

In the same way that there are portfolio managers to manage a suite of projects, organisations are realizing that portfolio change managers may be needed to effectively drive change success. Like the portfolio manager, the portfolio change manager also manages a particular group of initiatives. This grouping is usually done based on the size of change initiatives and or business groups. There are also examples of groupings by ‘value stream’ or program clusters. For example, a portfolio change manager may be in charge of all technology projects and supporting the technology group, whilst another portfolio change manager support sales and marketing initiatives or back office groups.

To download our infographic on how to manage a change portfolio click here.

As a new field, there is not a lot of ‘how-do’ guides for the new portfolio change manager. A quick scan of the internet found very little substance in term of all facets of the work of the portfolio change manager. This guide is written to fill this gap and to help those starting out in this role or decisions makers considering creating such roles to build change effectiveness.

To effectively manage the change initiatives within the portfolio, the change portfolio manager needs to proactively work on the below 7 key areas:

 

19833

Marketing group working on presentation. Scrum meeting, teamwork, task list. Business concept. Vector illustration can be used for presentation slides, landing pages, and posters

1) Service offering

Defining the service you are offering to the organization is one of the most critical activities. To do this, you need to conduct an assessment of where the organization is at and its various needs for change management services. Key questions to ask include:

  • How mature is the organization in managing change? You may want to refer to the Change Management Institute’s model of Change Maturity here to understand the different stages of organisational change maturity
  • How much change is the organization going through? This will help determine the capacity of services required
  • How much investment is the organization willing to make to support change management? There may be a budget already set or you may need to make a recommendation based on any available internal or external benchmarks
  • What are the most critical needs? Conduct stakeholder interviews or workshops with senior managers, middle managers and frontline groups to understand current change challenges holistically.

After understanding the needs of the organisations and where the organization would like to head to in its change management objectives, one can then define services required.

Common services offered by a portfolio change manager or portfolio change management function includes:

  1. Change project delivery services (e.g. change impact assessment, change planning, stakeholder management, etc.)
  2. Change diagnostics (e.g. initiative change health assessment)
  3. Change capability improvement offerings (e.g. training, workshop facilitation, leadership assessments)
  4. Coaching and advisory (e.g. for managers and leaders in driving change)

2) Service Delivery

After defining the service provision, the next activity to focus on is how these services will be delivered. This depends on organisational needs, resources available and the skills of available practitioners in the group.   Examples of service delivery options include:

  • Low involvement – Consultation

    1. Change activities are managed and driven by the business or project teams with targeted support from the Change group
    2. The change group is engaged as required over the life cycle of the project to provide guidance and consultation
    3. In terms of change capability, this involves advising and consulting with the business as required
  • Moderate involvement – Partnering

    1. Change activities are mostly delivered by the Change group with ongoing involvement from the business and the project team
    2. A resource is assigned to support the initiative over the whole life cycle. However, this may not require 100% full-time support and involvement may ramp up or down depending on project needs
    3. In terms of change capability, this involves working on significant pieces of deliverables such as change capability intervention design and delivery
  • High involvement – Full Delivery

    1. Under the full delivery model the Change group is directly accountable for managing all change deliverables, working alongside the project and business teams
    2. One or more full-time Change resource may be assigned to the whole project lifecycle, including specialists such as communications, learning or even organization design leads
    3. In terms of change capability, this involves significant work on a range of change capability interventions such as a range of learning programs, building air traffic control systems and individual leadership effectiveness assessment and coaching

Screen Shot 2020-01-12 at 4.52.30 pm

3) Manage resourcing & Forecasting demand

Depending on the services offered and business requirements, the Change team composition may look different. For example, for some organisations where the need is more on coaching and advisory services, fewer but more senior Change practitioners may be needed. On the other hand, for another organization where the focus is more on project delivery, the focus may be placed on a number of Change Managers and Change Analysts to support initiative delivery.

Key decision should be placed on achieving a balance of permanent headcounts versus contractors. Permanent in-house practitioners will have a deeper understanding of organisational needs and how the organization works. Contractor staffing is beneficial so as to allow the flexing or resources up or down across initiatives. Organisations that only rely on Change contractors usually fail to significantly build business change capability and maturity over time. This is because over time Change Management is seen by the business to be an activity done by contractor practitioners, thus not diluting their accountability. The group may also leverage external providers as needed for specialist skills or to offset any requirement peaks.

Forecasting demand is an important activity to get right so as not to set stakeholder expectations that cannot be fulfilled. Demand forecasting for Change services involves the following:

  1. Extrapolating any change capability organisational requirements into anticipated FTE resource levels. This may be done in consultation with the project management office (PMO), Human Resources and Senior Managers
  2. In resourcing for project delivery, the team needs to work closely with the PMO and project portfolio managers to anticipate demand. The Change group should also align with the PMO on any prioritization processes so as to be ‘joint-at-the-hip’ in focusing on critical initiatives that have been agreed to be the most strategic and valuable first and foremost.
  3. In scoping for each initiative the Change group needs to ensure that it is included and involved in the inception of the initiative. Often Change professionals are engaged when the project is well into implementation and when it may be too late to ‘fix’ any change issues. To adequately scope an initiative key questions to be asked include:
    1. How many parts of the business is impacted? How many employees?
    2. What is the magnitude of the impact?
  • What is the complexity of the change? Is it innovative or disruptive? Do we anticipate significant transitional efforts involved?
  1. What are the behavioural impacts?
  2. Are customers impacted?
  3. How are key stakeholder groups impacted? Could there be potential for stakeholder sensitivities?

To support purely agile projects, the Change group needs to define change deliverables throughout each phase of the initiative delivery cycle. From then, determine the resource requirement. Foundational change management work will still be applicable within an agile environment, including conducting change impact assessment, planning for change, measuring readiness for change and building business transition capability.

 

Screen Shot 2021-10-20 at 9.57.04 am

 

 

4) Portfolio management

At the lower end of the maturity curve, the Portfolio Change Manager may spend most of the time scoping for change resources, managing delivery, managing change professionals and liaising with key stakeholders. These are absolutely necessary activities. However, to really move up the strategic ladder the Portfolio Change Manager also needs to be able to influence the planning of the initiative portfolio versus only focusing on the delivery end of the curve.

In most organisations the PMO is tasked with managing the initiative investment and planning process. Most would refer to strategic objectives and goals and through this define the overall slate of initiatives for the coming year. Key data used include financial targets, initiative benefits, initiative resourcing and investment cost, and timing. The Portfolio Change Manager is often not involved in this process at all, or best, invited for comments around ‘change saturation’ or ‘change collision’ that are not substantiated by hard data.

To be at the decision table in planning effectively for change, the Portfolio Change Manager needs to be equipped with data to aid insight and decision making. How? By building an integrated view of change impacts. Currently, a lot of organisations still use a series of disjointed spreadsheets to try and articulate the change impacts across initiatives. The problem with this is is that:

  1. The data is based on a person’s judgment in terms of whether an initiative has high, medium or low impacts, and not linked to structured impact assessments
  2. The three categories of high, medium and low are mostly inadequate when the organization is going through a significant number of initiatives. Each category could include such a big range of impacts that it may not be precise enough for the business to use this data. Can the business use this data to forecast frontline impact and resourcing levels? Definitely no.
  3. The spreadsheet is also extremely manual, consuming significant time. And it also becomes out of date very quickly and so may not be trusted by senior leaders or the PMO. Large companies often have more than 100 initiatives. At this scale, a manual spreadsheet is inadequate to meet business needs.

To address this problem, The Change Compass is a digital tool designed to make it easier for the Change Portfolio Manager or the PMO to piece together all the change impacts across change initiatives. Each initiative owner inputs change impact data and the system prompts the user to update the data. The interface is intuitive and draws out the impacts step by step. The Portfolio Change Manager and other managers are able to instantly generate various reports. In a nutshell it helps the organization to manage the ‘air traffic control’ of landing initiatives. Moreover, it enables:

  • Single view of change impacts on the business, and allows diagnostic view at different organisational levels, e.g. team, sub-division, divisional and enterprise levels
  • Forecast business operations readiness and resourcing impacts from changes, e.g. frontline resourcing required, engagement channels required, stakeholder groups impacted, etc.
  • Measure/Model impact of changes on business performance indicators.  Understand correlation between change impact and customer satisfaction, service availability or other measures
  • View integrated heat map of all change impacts on customer experience, customer segment by customer segment
  • Build business change capability through change data and effective routines
  • Upgrade change work to become more strategic, leveraging data to have strategic conversations and support data-based business decision making
  • Support agile ways of working through managing iterative and continuous change across the board

To check out our article on how to better manage a change portfolio click here.

bubble_34e94c2b04a7a4041f5a8fccc0190671

5) Change Governance

The Portfolio Change Manager should work with the PMO and senior managers to ensure the appropriate governance and routines are designed and set up. To do this, analyse the business requirements in connecting different stakeholder groups to ensure alignment, buy-in, visibility and ownership of the initiative slate. Portfolio change governance bodies should include attendance by PMO, senior business leaders and the Portfolio Change Manager should focus on reporting and tracking on business impacts, business readiness, delivery milestones and delivery risk identification and mitigation.

Typical routines that the Portfolio Change Manager should assist in establishing include:

  1. Business unit level change planning and cadence (focused on initiative delivery)
  2. Business unit level change capability and program intervention planning and tracking (focused on change maturity)
  3. Initiative portfolio level planning, risk management and tracking
  4. Change team meeting
  5. As needed, enterprise level change planning and cadence

6) Change metrics and reporting

Whilst change impact data is critical to support the work of change governance bodies, there are other initiative-level metrics that the Portfolio Change Manager needs to be focused on in tracking and reporting. These include:

  1. Change readiness surveys
  2. Learning and development tracking and results
  3. Communication metrics such as hit rate or readership rate
  4. Stakeholder confidence ratings

Setup change governance

7) Methodology & tools

Currently, there is a significant trend of moving towards agile project methodology in most large organisations. This means that there are less focus and reliance on documentation, long planning cycles but more on effective conversations, stakeholder alignment, and constant iteration and learning. On top of this, a lot of organization are also moving toward scaled agile methodology (agile at organisational level vs. within an initiative). The Portfolio Change Manager needs to define key change deliverables and work approaches that suit his/her organization (acknowledging that agile may not suit every organization or every initiative).

Having effective change tools means that the business can self-help and the change practitioner can better coach and develop the business. For the Portfolio Change Manager useful tools may include:

  • Change scoping assessment tool for initiatives
  • Change resource estimation tool
  • Change Impact Assessment template/tool
  • Change plan template. For agile environments this would be the Change Canvas
  • Capability and skills assessment
  • Change readiness assessment
  • Change framework for the business to help uplift change capability. This should focus on key change outcomes and competencies for any change leader, written in a language they can understand

The Portfolio Change Manager is tasked with a complex set of tasks in driving a set of change initiatives for the organization. He/she needs to have the people skills to influence a range of stakeholders to transition to the new state. In addition, the person needs to possess business acumen and analytical skills to support the PMO and senior managers to make the right decisions to drive change across initiatives. Whilst not exhaustive, this guide calls out key critical areas undertaken by the Portfolio Change Manager. To be successful going forward, the Portfolio Change Manager needs to constantly deliver value and provide insight through leveraging digital tools and hard data to be at the decision-making table.

Check out our Ultimate guide to agile for change managers.

———————————————–

If you’ve found this article useful please like this on Linkedin

If you’ve found this article interesting, please ‘like’ and share this with your connections.

Comparing Change Portfolio Operating Models

ModelStructureBest suited toKey advantageKey risk
CentralisedSingle change function owns all CM deliveryOrganisations with mature CM capability and a consistent methodologyConsistency, standards, clear accountabilityCan become a bottleneck; may lose business unit context
FederatedEmbedded practitioners within business units, coordinated centrallyLarge, diverse organisations with distinct business unit culturesBusiness unit relevance, speed to actInconsistent standards; risk of siloed practice
HybridCore central function plus embedded BU practitionersOrganisations scaling from centralised to federatedBalances consistency with proximityRequires clear role boundaries and strong governance
Centre of Excellence (CoE)Small central team sets standards and provides tools; delivery is decentralisedOrganisations building CM capability broadly across business unitsScales capability broadly without central delivery overheadRequires high change management maturity across all BUs

Frequently Asked Questions

What is the difference between change portfolio management and project portfolio management?

Project portfolio management prioritises and resources a set of projects based on strategic value, cost, and capacity. Change portfolio management focuses on the human side of those same projects – assessing the cumulative change load on impacted groups, identifying capacity constraints, managing change saturation risk, and ensuring the portfolio of changes can actually be absorbed by the organisation. The two disciplines are complementary: effective organisations integrate them so that change capacity is a factor in project portfolio prioritisation decisions, not an afterthought.

How do you measure change portfolio health?

Portfolio health is typically assessed across three dimensions: delivery health (are change management activities being executed to plan across the portfolio?), adoption health (are people in impacted groups genuinely adopting the changes they are being asked to absorb?), and capacity risk (is the cumulative change load within the organisation’s ability to absorb, or are critical groups approaching saturation?). Digital change management tools that aggregate data across initiatives make portfolio health reporting practical at scale.

What causes change portfolio management to fail?

The most common failure mode is a visibility problem: organisations cannot manage what they cannot see. When change initiatives are planned and tracked independently, no one has a complete picture of cumulative impact on any given business unit or employee group. The result is change saturation, failed adoptions, and reactive crisis management. The second most common failure is insufficient governance – without a clear mandate and senior sponsorship, the portfolio change management function lacks the authority to intervene when individual initiatives are creating combined capacity risks.